[Construction Effect Verification Case] Major Food Factory Air Conditioning Outdoor Unit
The payback period is 6.4 months, which is a short span for a typical investment recovery!
We would like to introduce a case study on the effectiveness of cleaning and heat-insulating coatings applied to the outdoor air conditioning units of a major food factory. The verification method involved receiving the electricity consumption and costs from the customer before and after the installation to assess the effectiveness. As a result of the installation, we successfully achieved a reduction of 14.8% (6.12 million yen). The payback period for the installation costs is 6.4 months, which is notably short for typical investment recovery. 【Case Overview】 ■ Verification Method - Received electricity consumption and costs from the customer before and after the installation to assess effectiveness. ■ Verification Results - Successfully achieved a reduction of 14.8% (6.12 million yen). - The payback period for the installation costs is 6.4 months, which is notably short for typical investment recovery. *For more details, please download the PDF or feel free to contact us.
- Company:佐々木環境化学
- Price:Other